Report on Santar Projects October 91-March 92
April 6th, 1992
The second of three Prosyma Research Ltd reports to Santar on SAFIRE projects
“Santar Pipe and Forward Programme” 30th August 1991 and “Design of Fibre Lacing Device” 22 January 1993.
S F Bush
Introduction
- Commissioning the vacuum-forming pipe mandrel (at Santar).
- Commissioning the Mark VI granulation die (at UMIST).
- Modifications to Mark VI: manufacture with Polybond coupling agent.
- Results from AFI fibre.
- Precoating:
- UMIST
- Santar
- Commercial potential for SAFIRE granules: examination of competitor products.