Introduction

  1. Commissioning the vacuum-forming pipe mandrel (at Santar).
  2. Commissioning the Mark VI granulation die (at UMIST).
  3. Modifications to Mark VI: manufacture with Polybond coupling agent.
  4. Results from AFI fibre.
  5. Precoating:
    1. UMIST
    2. Santar
  6. Commercial potential for SAFIRE granules: examination of competitor products.